Skip to content
biometricdeviceTime & Attendance

UAE coverage

Installation and support in all seven emirates

Each emirate has its own gate pass requirements, site conditions and realistic travel times. We publish ours per emirate rather than promising same-day everywhere and explaining the exception after you have paid.
  • 7 emirates
  • Free survey
  • Swap units held for support

Choose your emirate

Local pages with local detail

Response times, the free zones and industrial areas we work in, the compliance quirks that apply locally, and a case study from that emirate.

Biometric Attendance Systems in Dubai

Same-day survey across Business Bay, JLT, DIFC, Al Quoz, DIP and JAFZA. SIRA-aware access control integration for towers and managed buildings.

Survey within 24 hours, installation typically within 48 hours of approval

View Dubai page →

Areas covered

  • Business Bay
  • JLT & JBR
  • DIFC
  • Al Quoz Industrial
  • Dubai Investment Park (DIP)
  • JAFZA & Jebel Ali
  • Deira & Bur Dubai
  • Dubai Silicon Oasis
  • Al Qusais
  • Dubai South

Biometric Attendance Systems in Abu Dhabi

Coverage across Mussafah, ICAD, KIZAD, Al Ain and the Corniche. Built for contracting firms and government-adjacent employers with strict audit requirements.

Survey within 48 hours in Abu Dhabi city and Mussafah; 2–3 working days for Al Ain and Al Dhafra

View Abu Dhabi page →

Areas covered

  • Mussafah (M-sectors)
  • ICAD I / II / III
  • KIZAD & Khalifa Port
  • Abu Dhabi Corniche & Hamdan St
  • Al Reem & Al Maryah Island
  • Musaffah Industrial
  • Al Ain
  • Ruwais & Al Dhafra
  • Yas & Saadiyat

Biometric Attendance Systems in Sharjah

Strong coverage of Sharjah Industrial Areas 1–18, SAIF Zone, Hamriyah Free Zone and Al Nahda. Dust- and heat-rated hardware for warehouse and factory floors.

Survey within 24–48 hours across all Sharjah industrial areas and free zones

View Sharjah page →

Areas covered

  • Sharjah Industrial Area 1–18
  • SAIF Zone
  • Hamriyah Free Zone
  • Al Nahda & Al Majaz
  • Al Qasimia
  • Muwaileh & University City
  • Al Sajaa
  • Khan Saheb / Emirates Industrial

Biometric Attendance Systems in Ajman

Ajman Industrial 1 & 2, Ajman Free Zone and Al Jurf. Cost-efficient bundles sized for 20–150 staff businesses.

Survey within 48 hours; often combined with a Sharjah route the same day

View Ajman page →

Areas covered

  • Ajman Industrial Area 1 & 2
  • Ajman Free Zone
  • Al Jurf
  • Al Nuaimiya
  • Al Rashidiya
  • Masfout

Biometric Attendance Systems in Ras Al Khaimah

RAKEZ, Al Hamra Industrial, Al Ghail and the quarrying belt. Hardware specified for heat, dust and remote connectivity.

Survey within 2–3 working days; survey and installation usually combined in one trip

View Ras Al Khaimah page →

Areas covered

  • RAKEZ (Al Hamra & Al Ghail)
  • Al Hamra Industrial Zone
  • Al Jazeera Al Hamra
  • Al Nakheel & Al Dhait
  • Khor Khwair quarries
  • RAK Maritime City

Biometric Attendance Systems in Fujairah

Fujairah Port, Fujairah Free Zone, the oil terminal belt and the hospitality strip along the east coast.

Survey within 3 working days; combined survey-and-install mobilisation standard

View Fujairah page →

Areas covered

  • Fujairah Port & Oil Terminal
  • Fujairah Free Zone 1 & 2
  • Fujairah City
  • Dibba
  • Al Hayl Industrial
  • Kalba & Khor Fakkan corridor

Biometric Attendance Systems in Umm Al Quwain

UAQ Free Trade Zone, Al Salamah industrial and the coastal business strip. Compact deployments, honest lead times.

Survey within 3 working days; typically routed with Ajman or RAK jobs

View Umm Al Quwain page →

Areas covered

  • UAQ Free Trade Zone
  • Al Salamah Industrial
  • Umm Al Quwain City
  • Al Raas
  • Falaj Al Mualla

How we cover the country

What 'we cover all seven emirates' actually means

Dubai, Abu Dhabi, Sharjah

Our highest-volume emirates. Survey within 24–48 hours, installation typically within 48 hours of quotation approval, on-site support attendance next working day.

Ajman, RAK, Fujairah, UAQ

Covered by our own engineers, routed alongside nearby jobs to avoid charging you for a dedicated trip. Realistic survey lead time is two to three working days, and we normally combine survey and installation into one mobilisation.

Free zones everywhere

JAFZA, DMCC, DAFZA, Dubai South, SAIF Zone, Hamriyah, RAKEZ, Ajman FZ, UAQ FTZ and Fujairah FZ all require engineer gate passes. We start that paperwork when you approve the quotation, because it — not the installation — usually sets the date.

Get a fixed quote after a free site survey

Tell us your site conditions and headcount. An engineer attends, tests enrolment on your actual staff, and you get one written quotation covering hardware, software, installation and training.

Same-day response, on-site survey within 48 hours

CallWhatsAppGet quote
Contact biometricdevice on +971 56 614 2543